
Our Product
Our team is here to guide you. Let us know your industry, load capacity, and usage requirements—we’ll recommend the best pallet solution tailored to your needs.


WOODEN PALLET
Reliable, Cost-Effective, and Customizable


We supply high-quality stick material—essential components used in the construction and repair of wooden pallets. Whether you're a pallet manufacturer or a company doing in-house pallet maintenance, our wood sticks offer the strength, durability, and consistency you need.
Our wooden pallets are the ideal solution for industries that require strong, affordable, and customizable transport platforms. Built from high-quality timber and treated for durability, these pallets are perfect for storage, domestic shipping, and international export.
Best for:
Logistics, warehousing, agriculture, manufacturing, exports






STICK FOR WOODEN PALLET
Quality Wood Components for Pallet Manufacturing and Repair
Applications:
Pallet manufacturing (new pallet production)
Pallet repair and refurbishing
Custom pallet solutions
Crates and other wood packaging needs


PLYWOOD SHEETS
Strong, Versatile, and Ready for Any Project
Our plywood is a high-performance wood panel made from multiple layers of thin wood veneer, bonded together for added strength and stability. It’s a popular choice for a wide range of applications—from construction and furniture to packaging and pallet decking.
Applications:
Furniture manufacturing
Interior design & cabinetry
Packaging and export crates
Pallet top decks
Flooring and wall paneling


PALLET RACKING SYSTEMS
Efficient Storage Solutions for Every Load Capacity
Maximize your warehouse space with our reliable and durable pallet racking systems, available in light duty, medium duty, and heavy duty configurations. Designed to support various storage needs, our racking solutions are ideal for industries such as logistics, manufacturing, retail, and cold storage.
Light Duty Rack : Ideal for Small & Lightwieght items
Medium Duty Rack : Versatile Storage for Moderate Loads
Heavy Duty Rack : Built for Strength & Stability


PLASTIC PALLETS
Durable, Hygienic, and Long-Lasting
Our plastic pallets are designed for clean, long-term use in demanding environments. They are lightweight, resistant to moisture and chemicals, and easy to sanitize—making them ideal for food, pharmaceuticals, and high-turnover industries.
Best for:
Food and beverage, pharmaceuticals, cleanrooms, export businesses




CARTON BOX
Strong, Secure & Customizable Packaging Solutions
Our carton boxes are designed to provide safe and reliable packaging for a wide range of products—from retail items and e-commerce shipments to industrial parts and storage needs. Made from high-quality corrugated cardboard, our boxes offer excellent strength, stackability, and protection during transit.
Applications:
Product packaging
E-commerce fulfillment
Office and warehouse storage
Export and logistics
Moving and relocation
Reliable and great quality from Mokutech!
Ramli K



★★★★★
" We’ve been sourcing both wooden and plastic pallets from PT Moku Anugrah Asia for over a year now, and the quality has been consistently excellent. Their team is responsive, and deliveries are always on time. Highly recommended! "
PT. Moku Anugrah Asia
"We provide high-quality wooden packing solutions."
CONTACT US :
our services
info@mokutech.asia
+62 812 8803 8343
MOKUTECH.ASIA © 2025. All rights reserved.


